tooling leadtime什么意思呢?(已解决)

M.W..Group
The tooling leadtime you provided for example is 30 days, does it include all stages of 1st shot, fine tune, revised, etc? 各位大大帮我看下tooling leadtime 和1st shot, fine tune在这里面是什么意思呢?谢谢
2013-05-19 1748阅读
问题/讨论
回复(6)
我要向AI提问
AI回答:
Tooling leadtime refers to the time it takes to complete the production and manufacturing of a tool or mold for a specific product. It includes all the stages involved in the tooling process, such as design, fabrication, testing, and final adjustments.

In the context of your question, "1st shot" refers to the initial production run using the newly created tool or mold. It is typically done to test the tool's functionality and the quality of the product. "Fine tune" refers to the process of making adjustments or modifications to the tool or mold based on the results of the first production run. This is done to optimize the efficiency and quality of the tooling process.

So, the tooling leadtime of 30 days that you mentioned should include all the stages, including the 1st shot and any necessary fine-tuning or revisions.
2023-07-03
追问:
  • wong
    非常正确,学习了
    2013-05-23
  • 时惠
    5楼的分析非常正确
    2013-05-22
  • kubrat.oladejo
    tooling leadtime 一般指模具的交期 也就是从设计到模具完全OK的时间
    1st shot指第一次试模 一般也称为: FOT: first of tool
    Fine tune 应该是修模
    客人的意思是说你们30天的模具交期里面有没有包含第一次试模,修模,模具变更等的时间
    2013-05-22
  • angela11
    tooling leadtime:模具发时间
    也存下了
    2013-05-21
  • kubrat.oladejo
    非常感谢
    2013-05-20
  • M.W..Group
    tooling leadtime:模具发时间
    客户是指你的模具发时间是否包括初次成型,精车和的所有工序?