QC080000认证审核注意事项,QC080000验厂审核英文版
IECQ Approved Component Products,
Related Materials & Assemblies Scheme
FOREWORD
This publication has been prepared by the IECQ Management Committee (IECQ MC) of the IEC
Quality Assessment System for Electronic Components (IECQ)..
This publication is directly related to the IECQ System management Basic Rules contained in
publications (IEC CA 01 + IECQ 01-S), IEC Harmonised Basic Rules (IEC CA 01) plus the IECQ
Supplement (IECQ 01-S).
Edition 2.3 was an administrative update to the IECQ logo and title. This editorial edition 2.2 of
IECQ 03-3 replaces the 2.1 edition IECQ 03-3. Main changes to this edition include:
– Includes align with the newly introduced IEC CA 01, IEC Harmonised Basic Rules Edition
2.0.
– Update all references to the former IECQ 01 document which is now replaced by combined
documents known as IECQ System management Basic Rules (IEC CA 01 + IECQ 01-S),
IEC Harmonised Basic Rules (IEC CA 01) plus the IECQ Supplement (IECQ 01-S)
– Inclusion of requirements for organizations operating from more than one location (site),
– Inclusion of requirements for organisations utilizing one management system on multi-sites,
– Inclusion Annex B (normative) Attestation of conformity which includes requirements for
Supplier’s Declaration of Conformity,
– Clarification of the integration of the IECQ previously operated scheme Qualification
Approval into these rules,
– Inclusion of requirements for the maintenance and transition for existing clients of IECQ
previously operated scheme Qualification Approval, Annex C,
– Inclusion of requirements in Annex D for previously operated scheme Capability Approval
as IECQ Approved Component category Capability,
– Inclusion of requirements in IECQ 03-3-1 for previously operated scheme Technology
Approval as IECQ Approved Component category Technology, as per Decision CABC
2011/15,
– Clarification on the use of Suspension and Cancellation (Withdrawal),
– Inclusion of Reinstatement of IECQ AC Certification,
– Inclusion of requirements for Changes (Modifications),
– Updated requirements for Subcontracting and use of IECQ Approved Process within this
scheme,
– Updated requirements for Identification of released lots,
– Inclusion of Annex A (Normative) Flow-chart for the application of Approved Component
(IECQ AC),
– Inclusion of Annex E (normative) Requirements for specifications used for Approved
Components.
This editorial update 2.2 edition of IECQ 03-3 provides clarification for correct implementation
and criteria of Distributors.