在线等大神们给翻译翻译,太专业了有点看不明白
1- dust extraction unit
2- no need for compressor, they he central compressor unit
3- in feed table which boards loaded on it by lift truck.
4- inspection unit
5- grading table (for 2 grades of particle boards which unloaded with lift truck.
6- electrical cabinets & plc
一个伊朗客户发来的询盘,有这些要求,真心看不太懂啊,求大神给解答一下,不胜感激[收起]
...[全文]