急需在印度的翻译

Theresa.Ugobor
设备安装指导时间:10月份-12月,实际:2个月,具体按照实际的情况去确定 翻译内容:冶金设备的安装指导,协调工程师与印度现场 若有兴趣请:QQ:12742991
2014-06-20 265阅读
问题/讨论
回复(0)
我要向AI提问
AI回答:
Installation Guide for Metallurgical Equipment: October-December, but the actual duration may be two months. Specific timing will be determined based on actual conditions. This job involves providing installation guidance for the metallurgical equipment, as well as coordinating between the on-site engineers and the Indian team. If interested, please contact QQ 12742991.
2023-05-22
追问:
最新回答
相关问答