Tank is in operation with a height of some 10 to 12 meters.
?? ?? ?? ?? ? Oil Grade is API 35. Up to 3 ppm H2S. Oil analysis
?? ?? ?? ?? ? Inlet via a 6” existing line at the bottom of the tank. One Valve is existing. -> Hook up point.
?? ?? ?? ?? ? Piping of some 50 m and safety installations (valves, flap valve…..) to be done.
?? ?? ?? ?? ? Intersection point between fixed installation and flexible hose to be defined (we will most probably go for unloading arms)
?? ?? ?? ?? ? Transport via Tank trailers is planned.
?? ?? ?? ?? ? Due to weight restriction the tank trailers will not be equipped with pumps.
?? ?? ?? ?? ? Metering is via Weight Bridge.
?? ?? ?? ?? ? Minimum Installation to be done as we are in a plant of another operator.
?? ?? ?? ?? ? Tractor head is ailable for 24 hours at this plant (will be bought new).