Different concrete pumps have different operating methods: 1. If it's a boom pump, after the job is done, do not empty the hopper. (To prevent it from being unable to suck after entering the air) Insert a cleaning ball into the pump pipe at the front end of the pipeline. Then raise the boom to a vertical state, and then operate the reverse pumping status. At this time, the concrete will be reversed from the feed hopper. Remember to use a hammer to strike the section of the conveying pipe connected to the pump truck when you hear an empty sound. Stop when empty sound disappears and empty the hopper. Inject clean water to pump normally until the cleaning ball appears at the front end of the pipeline, which means it's basically clean. 2. If it's a truck mounted pump or electric pump, a concrete tank truck is needed to flush with water. Open the bottom of the hopper and connect the pipeline and the pump truck at the interface of the conveying pipe, and then insert the cleaning ball into the pump pipe. Install the pipe clamp, and clean the material in the hopper. Fill the hopper with water from the tank. Start pumping when the water is full, and pump until the cleaning ball appears at the front end of the pipeline. During the pumping process, water quantity should be guaranteed enough. If the water is too short to clean the pipelines, it will be stuck in the middle, then more water needs to be added. And when pouring the water, keep the tank full to prevent air from entering. If air gets into the pipeline, the water will be sprayed back. The advantage of these pumping methods is to avoid wasting too much of concrete.
Some terms: Stand pump: 臂泵 Hopper: 料斗 Cleaning ball: 清洁球 Pipes: 泵管 Boom: 泵臂 Truck mounted concrete pump: 车载泵 Electric concrete pump truck: 电泵 Concrete tank car: 砼罐车
不同泵车的操作方法不同:
1. 如果是臂泵,作业完成后料斗中不要打空。(防止进入空气后吸不动)在管的最前边把清洁球塞入泵管。然后要把臂升成垂直状态。然后操作反泵状态这时混凝土会从进料斗反出来记得要用铁锤敲击连在泵车的那一段输送管。当听到空音后停止。然后把料斗清空。
Different stand pumps operate in different ways:
1. Once it is stand pump,the hopper should be not emptied after operation. (In order to prevent blocking after entering air) Insert cleaning ball into pump pipline at the forefront.Then raise the arm in vertical state. Thus operate reverse pump state,now the concrete will come out from feeding hopper, using a ham
原文: 然后要把臂升成垂直状态。然后操作反泵状态这时混凝土会从进料斗反出来记得要用铁锤敲击连在泵车的那一段输送管。当听到空音后停止。然后把料斗清空。
译文: Then raise the arm in vertical state. Thus operate reverse pump state,now the concrete will come out from feeding hopper, using a hammer to knock the concrete transportation pipe. When empty voice is heard, stop it. Finallly empty the hopper.
Stand pump
Do not keep the hopper empty after stop using the pump As the air may cause blocking !
Pls stuffed the cleaning ball into the pump pipes from forefront of the pipe then make the Booms plumb. Press Botton" S "(你们机器上应该有什么按键表示正泵,反泵的吧? to tipping out the concrete, Hit the delivery pipe with a Hammer until hearing an empty echo. Press botton"C" then Clean up the hooper with water .Stop cleaning when seeing the cleaning ball splash out from the pipe
Different stand pumps operate in different ways:
1. Once it is stand pump,the hopper should be not emptied after operation. (In order to prevent blocking after entering air) Insert cleaning ball into pump pipline at the forefront.