I have received your message and I am sincerely sorry for the delayed response.
I have forwarded your sample request to our technical department for review. After consulting with them, it seems that the steel pipes you requested are not in stock and will require a new mold to be produced. Our supplier will need to produce at least one ton of material to create the new mold.
However, we do have steel pipes with a diameter of 12mm and thickness of 1mm available that do not require a new mold, and may be suitable for your needs. Can you please specify your specific requirements for the steel pipes, so we can make sure they meet your needs?
Regarding the pipe clamp, it appears that we do not have the exact same design in stock and would need to produce a new mold. The cost for a new mold would be approximately $600 USD.
However, I would like to suggest taking a look at the attached pipe clamp, which is similar to the sample you provided. With some modifications to the mold, we can make it work for your needs and save you money.
Thank you for your time and consideration. Please let me know if you have any further questions or concerns.
Well received your email and sorry for my late reply.
Our technicians find nothing in stock ailable after studying your sample. We will need a new mold for your pipe if your want it exactly the same as the sample. To get the mold reopened, there will be a MOQ of 1 ton from our raw material supplier. Here is our pipe just ailable and much alike yours: dimensions are 12mm at diameter and 1mm at thickness.
And the clamp is in a similar situation. Cost of a new mold is about USD6
Nice day! I he received your email and sorry for my delay reply.
I he communicated with the technique department that there isn’t the pipe you need now, if reproduce the mold, it is need 1t for the raw material manufacturer to produce. But now we he the spot which diameter is 12 mm and thickness is 1mm. I suggest that you could use our existing product. And is there any require for the pipe? We can machining it with your demand.
What’s more, there isn’t the s
thank you for your email and sorry for my late reply.
I he got your samples and passed to the engineer departments, I has been told that the PIPE you need he no stock, we need to make a new moulds to produce it but he to order more than 1 TON. we suggest to use D12mm and Thickness 1mm which are on on stock and no need tooling charges.