给英国客户的回复 不知道怎么组织语言

Ramiro
给英国客户的回复??实在不知道怎么组织语言 大致意思是这样的 你的回复我已经看到了??我为我的延迟回复感到抱歉 你的样品我已经给我们的技术部了??技术部跟我商量说 你要求的钢管没有??需要重新模具??但是重新模的话原料厂家得起码一吨才能模具生产??我们手上有直径12mm厚度1mm的??我建议使用我们的 这样不用模具??另外你对钢管的具体要求是什么 我们可以根据你的要求 另外管夹也没有相同的 需要重新模具生产??费用大约是600美金 但是我建议可以看一下附件中的管夹 跟样品是类似的 只需要改动模具 这样可以减少你们的费用 希望你可以考虑下我的建议
2014-01-10 619阅读
问题/讨论
回复(3)
我要向AI提问
AI回答:
Dear [客户名],

I have received your message and I am sincerely sorry for the delayed response.

I have forwarded your sample request to our technical department for review. After consulting with them, it seems that the steel pipes you requested are not in stock and will require a new mold to be produced. Our supplier will need to produce at least one ton of material to create the new mold.

However, we do have steel pipes with a diameter of 12mm and thickness of 1mm available that do not require a new mold, and may be suitable for your needs. Can you please specify your specific requirements for the steel pipes, so we can make sure they meet your needs?

Regarding the pipe clamp, it appears that we do not have the exact same design in stock and would need to produce a new mold. The cost for a new mold would be approximately $600 USD.

However, I would like to suggest taking a look at the attached pipe clamp, which is similar to the sample you provided. With some modifications to the mold, we can make it work for your needs and save you money.

Thank you for your time and consideration. Please let me know if you have any further questions or concerns.

Best regards,

[你的名字]
2023-06-22
追问:
  • Jimmy.Wang2
    Dear XXX,

    Well received your email and sorry for my late reply.

    Our technicians find nothing in stock ailable after studying your sample. We will need a new mold for your pipe if your want it exactly the same as the sample. To get the mold reopened, there will be a MOQ of 1 ton from our raw material supplier. Here is our pipe just ailable and much alike yours: dimensions are 12mm at diameter and 1mm at thickness.

    And the clamp is in a similar situation. Cost of a new mold is about USD6
    2014-01-11
  • anna.yang
    真是好运啊,这次是英国的了。
    Dear Sir,

    Nice day! I he received your email and sorry for my delay reply.
    I he communicated with the technique department that there isn’t the pipe you need now, if  reproduce the mold, it is need 1t for the raw material manufacturer to produce. But now we he the spot which diameter is 12 mm and thickness is 1mm. I suggest that you could use our existing product. And is there any require for the pipe? We can machining it with your demand.
    What’s more, there isn’t the s
    2014-01-11
  • M.W..Group
    Dear XXX

    thank you for your email and sorry for my late reply.

    I he got your samples and passed to the engineer departments, I has been told that the PIPE you need he no stock, we need to make a new moulds to produce it but he to order more than 1 TON.  we suggest to use  D12mm and  Thickness 1mm which are on on stock and no need tooling charges.