30万美金订单投标计划书
Selina4
客人要求写投标计划书,麻烦的要死,准备工作一大堆.各位大侠能不能参考下该怎么写呀,跪求,多谢先多谢了
6.1 A detailed work plan indicating how he/she intends to undertake the various activities for the supply of the canvas backpack. The plan should include a detailed schedule of delivery to the logistics and distribution hub as well as the detailed segments of lead time utilized; and
6.2 A detailed risk management plan indicating contingency plans to minimise the occurrence of any risk or eventuality that may negatively impact on the Service Provider’s obligations or performance in terms of this tender. The following risks should be addressed in the plan:
? Ensuring enough canvas backpacks are ailable;
? Machinery failure;
? Strikes;
? Storage;
? Addressing need for increased capacity;
? Shortages in delivery;
? Delivery of the wrong canvas backpacks or wrong quantities and subsequent reverse logistics;
? oidance of multiple deliveries;
? Continued ailability of staff;
? Damaged items;
? Disruptions at logistics and distribution hub or logistics and distribution hub closed on day of delivery;
? Delays due to adverse weather conditions;
? Increased fuel and labour costs; and Any other possible risks foreseen or unforeseen
The above risks must be built into the pricing structure for the delivery of the project and must not be seen as an add-on at a later stage of the project.
6.3 A detailed breakdown of costs per unit for the canvas backpack, all inclusive of costs with a fixed ceiling price thereof for canvas backpack and delivery to appointed logistics and distribution hub. The ceiling price must include all expenses and is inclusive of risks for the project. The ceiling price must be inclusive of any current or future increases in material, fuel and labour costs and risks identified.
6.4 Bidders must indicate a minimum of three relevant recent references for whom, when and how many canvas backpacks they supplied, inclusive of contact details of relevant clients. The bidders must also include “Letters of Recommendation” from these clients. Bidders must provide the information in the following format:
REFERENCE PROJECT 1
Client Name
Name of Contact Person
Contact Details
Project Name and Brief Description
Project Start and End Dates
Project Value
6.5 The bidders to be Service Provider(s) must also indicate how long they he been in the business for the supply of the required documents.
6.6 Bidders must submit a sample of the canvas backpacks that will be supplied for this contract.